References(Page 36)

References(Page 36)

References

2011 Transport of crane girders

The transport of crane girders from Brnoto Cologne. Using a special semi-trailer we transported crane girders on the route Brno - Cologne.

More information

2011 Laying Hřensko bridge girders

Construction of a bridge in Hřensko required the transportation of bridge girders and subsequent crane work.

More information

2010 Transport of vessel for coal-fired power station

Transport of oversized cargo for a coal-fired power station. Using a deep semi-trailer, we transferred a vessel of diameter 7.52 m and height 4.35 m on the route Benešov – Mělník.

More information

2010 Transport of bridge structure

Transport of bridge structure. Using a special semi-trailer, we transported the bridge structure from Brno to Planá u Mariánských Lázní. Oversized cargo height 4.5m, length 44m.

More information

2010 Transport of footbridge steel section

Transport of footbridge steel section to Pilsen. Using a special semi-trailer, we transferred the bridge structure from Prague to Pilsen. Width of oversized cargo 5.2m, length 42m.

More information

2010 Transport of catalysers

Transport of catalysers, Benešov - Stráž pod Ralskem. Using a frame semi-trailer, we transported catalysers from Benešov to Stráž pod Ralskem. Length of oversized cargo 11 m, diameter 5.4 m

More information

2010 Transport of mill parts

Carriage of mill parts, Uničov – Mělník. Using a special semi-trailer, we transported mill parts from Uničov to Mělník. Length of oversized cargo 18 m, diameter 4.6 m.

More information

2010 Transport of nuclear power station parts

Transport of nuclear power station parts on the route Pilsen – Lovosice – Olkiluoto. Using a deep semi-trailer, we transported nuclear power station parts from Škoda JS.

More information

2010 Removal of Gothic bell by crane

Removal of Gothic bell. Using a crane, we removed the Maria Hilf Gothic bell dating back to 1419.

More information

2010 Assembly of concrete road bridge girders

Using a crane, we assembled the concrete girders for the road bridge in thevillage of Pila

More information