References(Page 32)

References(Page 32)
References

2011 Kaufland SC, Český Krumlov
We undertook complex earthworks and extensive landscaping for a new shopping centre in Český Krumlov.

2011 Rerouting the I/27 road, Třemošná
We undertook earthworks in the village of Třemošná for rerouting the I/27 road.

2011 Construction of the R1 Beladice – Tekovske Nemce expressway
We constructed an expressway in the Central Slovakia region. This involved the complete construction of the body of the motorway, earthworks and construction work.

2011 Increasing water flow capacity Pivoňka - Poběžovice
We undertook earthworks in the water management sector in the village of Poběžovice. In addition to cutting back greenery, we implemented earthworks and implemented stone flattening and transfer on the river bed.

2011 Transport of Shermantank from Vilseck to Pilsen zoo
Carriage of tank to Pilsen zoological gardens. Using a lowered semi-trailer (Jumbo) we transported a tank of dimensions 6.0 x 2.75 x 3.35m.

2011 Extension of seniors’ home in Nové Strašecí
We realized a complete extension of seniors’ home in Nové Strašecí.

2011 Reconstruction of Sladkovského x Koterovská tramline
We undertook the demolition of the old tramline, and subsequently implemented the earthworks and construction work for the new line including the supply and assembly of the track system.

2011 Transport and storage of bridge structure
Using a special semi-trailer and the railways, we transported a bridge structure. Using a crane, the structure was laid on the on the bridge supports.

2011 Transport of Děčín tank
Using a special semi-trailer, we transported a tank and transferred it onto a boat by crane in Děčín.

2011 Work on the Church of the Assumption dome in Kozlov
Work on the church dome and subsequent fixing was done with the use of an AC 200 truck-mounted crane.