2012 Demolition of the České typografie (Rudé právo) building and special foundation work for the new Florentinum building in Prague, Florenc

We implemented complete demolition of all buildings and subsequent special foundation work for the construction of the Florentinum administrative centre in the centre of Prague.

More information

2012 Ship transportation

With using of the frame loader we transported a ship of size 27 x 5,45 x 4,2 m.

More information

2012 Saving of water turbine - Svijany

During implementing orders for saving of turbine in Svijany we used cranes AC 50 and AC 100.

More information

2012 Instalation of technological devices in Prefa, Prague

We installed a technological devices in Prefa Prague with using of our telescopic crane AC500 and high-lift platform Ruthman T-370.

More information

2012 Instalation of technological devices at heating plant in České Budějovice

We realized instalation of technological devices at heating plant in České Budějovice with using of the telescopic crane AC350.

More information

2012 Installation of transformer station in Modrava

We installed the transformer station in Modrava with using of our crane AC50.

More information

2012 Dismantling of the bridges in Pruneřov

Dismantling of the bridges in Prunéřov was performed with using of the lattice crane TC2800.

More information

2012 Installation of the railway bridge in a corridor Plzeň - Cheb

We used the telescopic crane AC350 for installation of the railway bridge in a corridor Plzeň - Cheb.

More information

2012 Installation of sluices valve of the dam in Hracholusky

We provided an installation of sluices valve with using of the telescopic crane AC30 and AC35.
Location: the dam of Hracholusky

More information