2012 Štěnovice – earthworks for the construction of the Maurice Ward logistics park
We undertook earthworks for the construction of a logistics park in the village of Štěnovice. As well as complete rough landscaping, we implemented the foundation for the hall floor and made roads and hard surfaces.

2012 Demolition of Techmánia science center
We undertook the demolition of the former ‘Škoda canteen’, a listed building + demolition and demolition by hand of the current museum building in Pilsen

2012 Transport and saving of steel tanks in Velké Popovice
Store tanks in Velké Popovice brewery we realized with the telescopic cranes AC 40 and AC 100

2012 Transport and building of VTE Horní Paseky
We transported turbine components with the help of our special loaders. For the construction then we used the lattice crane CC 2800 and the telescopic crane AC200

2012 Dismantling of the bridges in Pruneřov
Dismantling of the bridges in Prunéřov was performed with using of the lattice crane TC2800.

2012 Installation of the railway bridge in a corridor Plzeň - Cheb
We used the telescopic crane AC350 for installation of the railway bridge in a corridor Plzeň - Cheb.

2012 Installation of sluices valve of the dam in Hracholusky
We provided an installation of sluices valve with using of the telescopic crane AC30 and AC35.
Location: the dam of Hracholusky

2012 Replacing of the historical wagon
We replaced the historical wagon with using of the telescopic crane AC100.

2012 Installing of the press into the hall in Dobřany
With using of our cranes AC100 and AC350 we installed the press into the production hall in Dobřany.