2013 Transit through hub Plzeň
We are executing an earthwork in Prokopova street and earthworks for the new subway in Šumavská street in Pilsen.

2013 Disassembly of Tunnel shield in Pilsen
Telescopic crane AC 50 was used to disassemble Tunnel shield at the construction site of new Uslavas´sewage collector in Pilsen.

2012 Mills casing transportation
We transported a mills casing about dimension 8,48 mand weight 119 tons to the Mělník harbor.

2012 Transportation of the bus to London
Transportation of the bus by designer David Černý to London, venue of 15th Olympics. With using of the frame loader we transported unique double-decker bus from work-room of Prague designer before the Czech House in London.

2012 Demolition of the České typografie (Rudé právo) building and special foundation work for the new Florentinum building in Prague, Florenc
We implemented complete demolition of all buildings and subsequent special foundation work for the construction of the Florentinum administrative centre in the centre of Prague.

2012 Ship transportation
With using of the frame loader we transported a ship of size 27 x 5,45 x 4,2 m.

2012 Instalation of technological devices in Prefa, Prague
We installed a technological devices in Prefa Prague with using of our telescopic crane AC500 and high-lift platform Ruthman T-370.

2012 Instalation of technological devices at heating plant in České Budějovice
We realized instalation of technological devices at heating plant in České Budějovice with using of the telescopic crane AC350.

2012 Installation of transformer station in Modrava
We installed the transformer station in Modrava with using of our crane AC50.