References(Page 37)

References(Page 37)

References

2009 Wind farm – Mlýnský vrch 1

We undertook earthworks and ground preparation for the construction of 4 wind turbines including their foundations in the village of Krásná u Aše.

More information

2009 Transport of steel vessels

Transport of steel vessels of diameter 5.8 m and length 9 m. Using frame semi-trailers, we transported the steel vessels on the route Mlékosrby – Stráž pod Ralskem.

More information

2009 Transport of wind turbines

Transport and construction of wind turbines. Using our technology, we prepared and erected wind turbines in Horní Částkov.

More information

2009 Assembly of technologies in Klatovy

Using a truss crane of up to 600t and a telescopic crane of up to 160t, we assembled technologies in Klatovy.

More information

2009 Assembly of technologies in Kralupy nad Vltavou

Using telescopic cranes, we assembled technologies in Kralupy nad Vltavou.

More information

2009 Air conditioning unit installation

Assembly of air conditioning unit was performed with using of the telescopic crane with capacity to 500 tons.

More information

2009 Water turbine Troja

With help of crane AC 350 + AC 160 we placed part of turbine into a new water plant in Prague Troja

More information

2009 Assembly of heating plant Chomutov

Lifting of the technology at Chomutov heating plant we performed with help of truss crane CC 2000.

More information

2009 Disassembly of railway bridge at Benešov

With help of telescopic crane AC 350 we disassembler railway bridge.

More information