2009 Wind farm – Mlýnský vrch 1
We undertook earthworks and ground preparation for the construction of 4 wind turbines including their foundations in the village of Krásná u Aše.
2009 Circle apartment block – 1st phase
We dug deep lagged foundation trenches in the centre of Pilsen for the construction of the Circle apartment block.
2009 Demolition of Tesco Liberec shopping centre
We implemented the complete demolition of the Tesco shopping centre in the centre of Liberec.
2009 Transport of steel vessels
Transport of steel vessels of diameter 5.8 m and length 9 m. Using frame semi-trailers, we transported the steel vessels on the route Mlékosrby – Stráž pod Ralskem.
2009 Transport of wind turbines
Transport and construction of wind turbines. Using our technology, we prepared and erected wind turbines in Horní Částkov.
2009 Air conditioning unit installation
Assembly of air conditioning unit was performed with using of the telescopic crane with capacity to 500 tons.
2009 Transport of water turbine Praha - Trója
Transport of water turbine for new hydroelectric plant at Prague, Trója, was performed
by help of special truck.
2009 Transport of boiler to Chomutov
With use of special trailer, we transported part of boiler on route Praha - Chomutov.
2009 Disassembly of railway bridge at Benešov
With help of telescopic crane AC 350 we disassembler railway bridge.
2009 Placement of press machine at Rokycany
Telescopic crane AC 35 was used to place bed to press machina.