References(Page 38)

References(Page 38)
References

2009 Circle apartment block – 1st phase
We dug deep lagged foundation trenches in the centre of Pilsen for the construction of the Circle apartment block.

2009 Foundation for welded rotors
We undertook demolition of old foundations and subsequent earthworks and the construction of new foundations for welded rotors inside a factory in Pilsen.

2009 Blanka tunnel, Prague
We undertook earthworks in an enclosed tunnel body in the construction of the Blanka tunnel in Prague.

2009 Demolition of Tesco Liberec shopping centre
We implemented the complete demolition of the Tesco shopping centre in the centre of Liberec.

2009 Demolition of bridge in Plasy
We undertook the demolition of a bridge in difficult conditions in the town of Plasy.

2009 Demolition work in Pilsen heating plant
We implemented the demolition of parts of the building using a crane in the Pilsen heating plant.

2009 Transport of water turbine Praha - Trója
Transport of water turbine for new hydroelectric plant at Prague, Trója, was performed
by help of special truck.

2009 Transport of boiler to Chomutov
With use of special trailer, we transported part of boiler on route Praha - Chomutov.

2009 Transport of new tram
With use of special trailer Goldhofer STZ L6, we transported new type of tram on route Plzeň - Praha.

2008 Bridge demolition in Spalene Porici
In town Spalene Porici we realized the bridge demolition through creek include material disposal.