2008 Chimney demolition in Pilsen
Chimney demolition was proceed in area of transport undertaking in Pilsen include material disposal.
2008 Bridge demolition in Podebrady
Demoliton of the bridge through Labe river in Podebrady with using of crane technique.
2008 Transport of wind turbine Pchery
Transport of parts of wind turbine on route Poland – Pchery. With use of special trailer, we transported parts of wind turbine Pchery.
2008 Transport of tram Porsche
Transport of new tram. With use of special trailer, we transported new type of tram on route Plzeň - Praha.
2008 Transport of bridge to Jenišov
With use of platform trailer, we transported concrete parts of bridge on route Praha - Jenišov.
2008 Transport of beams Chomutov
With use of low deck trailer and specila trailer we transported concrete beams of size 30 x 2,5 x 1m on route Litice nad Orlicí – Chomutov.
2008 Transport of rock cutter
With use of special trailer, we transported new rock cutter on route Plzeň - Votice.
2008 Transport of air technology
With use of lowboy trailer, we transported part o fair technology on route Valašské Meziříčí - Mělník
2008 Assembly of column at Vřesová by crane AC 350
With help of crane AC 350 we performed assembly of column at Vřesová.
2008 Placement of technology of residental building at Chodov
By telescopic crane AC 100 we realized placeing of technology on top of residenta building at Chodov.