2006 Earthworks in Kunice
Execution of complete land levelling, earthworks, excavating and backfilling. Next were execute a backfills reinforced by geo-lattice to high 13 m.

2006 Mysak gallery in Praha
In gallery Mysak we realized an earthworks on excavated land coffer dam in center of town Praha to depth 16 m under the terrain.

2006 Paladium Praha
We realized a demoliton and earthworks on excavated land coffer dam to depth 21 m under the terrain during construction of Paladium in Praha.

2006 Transport of dumper
With use of low deck trailer, we transported demper on route Pilsen - Prague.

2006 Transport of dryer parts
By use of frame trailer and low deck trailer, we implemented transport of dryer on route Kolín - Mělník.

2006 Transport of grain cleaner
Transport of grain cleaner on the route Teplice – Russia. With use of low deck trailer, we transported load of dimentions of 10,5 x 2,5 x 3m.

2006 Ice stadium Domažlice
For construction of ice staduim at Domažlice we used help of our crane AC 100.

2006 Wind turbine Žipotín
With help of our special trailers we transported components of wind turbine. To assemble it we used our telescopic cranes AC 100 and AC 350.

2006 Assembly of steel bridge Hostinné TC 2800-1
To assembler steel bridge we used trus crane TC 2800 - 1 and telescopic crane AC 200 and AC 350.

2006 Installation of walkway at Barandov
Installation of walkway we implemented with use of telescopic crane AC 100 and AC 350.