References(Page 48)

References(Page 48)

References

2006 Earthworks in Kunice

Execution of complete land levelling, earthworks, excavating and backfilling. Next were execute a backfills reinforced by geo-lattice to high 13 m.

More information

2006 Mysak gallery in Praha

In gallery Mysak we realized an earthworks on excavated land coffer dam in center of town Praha to depth 16 m under the terrain.

More information

2006 Paladium Praha

We realized a demoliton and earthworks on excavated land coffer dam to depth 21 m under the terrain during construction of Paladium in Praha.

More information

2006 Transport of dumper

With use of low deck trailer, we transported demper on route Pilsen - Prague.

More information

2006 Transport of dryer parts

By use of frame trailer and low deck trailer, we implemented transport of dryer on route Kolín - Mělník.

More information

2006 Transport of grain cleaner

Transport of grain cleaner on the route Teplice – Russia. With use of low deck trailer, we transported load of dimentions of 10,5 x 2,5 x 3m.

More information

2006 Ice stadium Domažlice

For construction of ice staduim at Domažlice we used help of our crane AC 100.

More information

2006 Wind turbine Žipotín

With help of our special trailers we transported components of wind turbine. To assemble it we used our telescopic cranes AC 100 and AC 350.  

More information

2006 Assembly of steel bridge Hostinné TC 2800-1

To assembler steel bridge we used trus crane TC 2800 - 1 and telescopic crane AC 200 and AC 350.

More information

2006 Installation of walkway at Barandov

Installation of walkway we implemented with use of telescopic crane AC 100 and AC 350.

More information