References(Page 50)
References(Page 50)
References
2006 Mysak gallery in Praha
In gallery Mysak we realized an earthworks on excavated land coffer dam in center of town Praha to depth 16 m under the terrain.
2006 Paladium Praha
We realized a demoliton and earthworks on excavated land coffer dam to depth 21 m under the terrain during construction of Paladium in Praha.
2006 Highway D3 from Mezno to Chotoviny
A earthworks were realize on sector of D3 highway from Mezno to Chotoviny.
2006 CTP in Bor u Tachova
Complete landlevelling for B2 hall of industrial zone in Bor u Tachova were realized include nets and roads.
2006 Transport of dryer parts
By use of frame trailer and low deck trailer, we implemented transport of dryer on route Kolín - Mělník.
2006 Transport of grain cleaner
Transport of grain cleaner on the route Teplice – Russia. With use of low deck trailer, we transported load of dimentions of 10,5 x 2,5 x 3m.
2006 Transport of generator Pilsen - Mělník
By help of special trailer, we transported generator on route Pilsen – Mělník with weight of 175t.
2006 Assembly of steel bridge Hostinné TC 2800-1
To assembler steel bridge we used trus crane TC 2800 - 1 and telescopic crane AC 200 and AC 350.
2006 Installation of walkway at Barandov
Installation of walkway we implemented with use of telescopic crane AC 100 and AC 350.
2006 Lining up chimney at Lovosice
Telescopic crane AC 350 was used to lining up chimney at power plant Lovosice.