References(Page 50)

References(Page 50)

References

2006 Mysak gallery in Praha

In gallery Mysak we realized an earthworks on excavated land coffer dam in center of town Praha to depth 16 m under the terrain.

More information

2006 Paladium Praha

We realized a demoliton and earthworks on excavated land coffer dam to depth 21 m under the terrain during construction of Paladium in Praha.

More information

2006 Highway D3 from Mezno to Chotoviny

A earthworks were realize on sector of D3 highway from Mezno to Chotoviny.

More information

2006 CTP in Bor u Tachova

Complete landlevelling for B2 hall of industrial zone in Bor u Tachova were realized include nets and roads.

More information

2006 Transport of dryer parts

By use of frame trailer and low deck trailer, we implemented transport of dryer on route Kolín - Mělník.

More information

2006 Transport of grain cleaner

Transport of grain cleaner on the route Teplice – Russia. With use of low deck trailer, we transported load of dimentions of 10,5 x 2,5 x 3m.

More information

2006 Transport of generator Pilsen - Mělník

By help of special trailer, we transported generator on route Pilsen – Mělník with weight of 175t.

More information

2006 Assembly of steel bridge Hostinné TC 2800-1

To assembler steel bridge we used trus crane TC 2800 - 1 and telescopic crane AC 200 and AC 350.

More information

2006 Installation of walkway at Barandov

Installation of walkway we implemented with use of telescopic crane AC 100 and AC 350.

More information

2006 Lining up chimney at Lovosice

Telescopic crane AC 350 was used to lining up chimney at power plant Lovosice.

More information