References(Page 38)

References(Page 38)

References

2010 Transport of mill parts

Carriage of mill parts, Uničov – Mělník. Using a special semi-trailer, we transported mill parts from Uničov to Mělník. Length of oversized cargo 18 m, diameter 4.6 m.

More information

2010 Transport of catalysers

Transport of catalysers, Benešov - Stráž pod Ralskem. Using a frame semi-trailer, we transported catalysers from Benešov to Stráž pod Ralskem. Length of oversized cargo 11 m, diameter 5.4 m

More information

2010 Transport of footbridge steel section

Transport of footbridge steel section to Pilsen. Using a special semi-trailer, we transferred the bridge structure from Prague to Pilsen. Width of oversized cargo 5.2m, length 42m.

More information

2010 Transport of bridge structure

Transport of bridge structure. Using a special semi-trailer, we transported the bridge structure from Brno to Planá u Mariánských Lázní. Oversized cargo height 4.5m, length 44m.

More information

2010 Transport of vessel for coal-fired power station

Transport of oversized cargo for a coal-fired power station. Using a deep semi-trailer, we transferred a vessel of diameter 7.52 m and height 4.35 m on the route Benešov – Mělník.

More information

2010 Demolition of Karlovy Vary hospital

We undertook the demolition of the old hospital buildings in Karlovy Vary.

More information

2010 Demolition of building on Sokolovská str. – site of Kliment meat plant

In Prague, we undertook the complete demolition of the site of Kliment meat plant.

More information

2010 Demolition of the R6 bridge, Staré Sedlo

Using crane equipment, we undertook the demolition of the reinforced concrete R6 bridge in Staré Sedlo.

More information

2010 Intensification of Pilsen Sewage Treatment Plant

We undertook earthworks and construction repair work as part of the intensification of Pilsen Sewage Treatment Plant.

More information

2010 Reconstruction of tramline Pilsen - Slovany

We undertook earthworks and construction work during tramline reconstruction. The BKV panels and track had to be disassembled, the foundation corrected and the panels and track reassembled.

More information