References(Page 14)
References(Page 14)
References
2018 Turbine transportation and unloading
Turbine unloading by using mobile crane AC 500.
2018 Dismantling of railway foot over bridge in Cheb
By using mobile crane AC500 we carried out dismantling of railway foot over bridge in Cheb.
2018 VTE gearbox replacement
By using mobile crane AC 500 we carried out VTE gearbox replacement. ... More information
2018 Demolition of the bridge on D1 highway near Třemošnice.
Demolition of the bridge on D1 highway near Třemošnice.
2018 2nd phase of D1 motorway modernization
Within the 2nd phase of D1 motorway modernization and extension we provide earthworks, soil stabilization, including the laying down of drainages, gutters, sewerage and preparation of the gravel layer.
2018 ZF Electronics Klášterec s.r.o
Earthworks for the construction of a new hall ZF Electronics Klášterec s.r.o. We provide excavation of the pit, transport and deposit of material in the total volume of earthworks about 50,000 m3.
2018 Dismantling of the railway bridge in Nejdek
The AC 500 crane was used to dismantle the railway bridge in Nejdek and to install a temporary bridge.
2018 Earthworks for new premises of EvoBus in Holýšov
Earthworks for new premises construction of EvoBus in Holýšov, including the topsoil removal, excavation and deposit of material in the total volume of earthworks about 250 000 m3
2018 Transport of trams 18T type from Plzen Škoda Transportation to Turkey
Transport of trams 18T type from Plzen Škoda Transportation a.s. to Turkey.