2018 Installation of beer tanks in Budweiser Budvar
With the AC 350 mobile crane we installed 34 pieces of beer tanks in Budweiser Budvar. ... More information
2018 Technology dismantling in mine Bílina
By using mobile cranes AC 200 and AC 160 we dismantled technology in mine Bílina.
2018 Installation of technology in Klatovy
Installation of technology by using AC 200 and AC 35 mobile cranes.
2018 Turbine transportation and unloading
Turbine unloading by using mobile crane AC 500.
2018 Dismantling of railway foot over bridge in Cheb
By using mobile crane AC500 we carried out dismantling of railway foot over bridge in Cheb.
2018 VTE gearbox replacement
By using mobile crane AC 500 we carried out VTE gearbox replacement. ... More information
2018 Demolition of the bridge on D1 highway near Třemošnice.
Demolition of the bridge on D1 highway near Třemošnice.
2018 2nd phase of D1 motorway modernization
Within the 2nd phase of D1 motorway modernization and extension we provide earthworks, soil stabilization, including the laying down of drainages, gutters, sewerage and preparation of the gravel layer.
2018 ZF Electronics Klášterec s.r.o
Earthworks for the construction of a new hall ZF Electronics Klášterec s.r.o. We provide excavation of the pit, transport and deposit of material in the total volume of earthworks about 50,000 m3.
2018 Dismantling of the railway bridge in Nejdek
The AC 500 crane was used to dismantle the railway bridge in Nejdek and to install a temporary bridge.