References in category"Reference" (Page 13)

References in category"Reference" (Page 13)

References

2017 Dismantling of the second part of the railway bridge in Pilsen

We dismantled the second part of the railway bridge in Pilsen - the main railway station using the telescopic crane AC 350.

More information

2017 Assembly of steel tank at Pilsen

Autocranes AC 30 and AC 50 have done disassembly and assembly of the steel tank.

More information

2017 Transportation of steel tank from Benešov to Dobříč

Transportation of steel tank from Benešov to Dobříč

More information

2017 Loading of portal crane

We performed loading of portal crane with use of crane AC 100 and it´s transportation.

More information

2017 New production and storage hall Ostrov u Stříbra

Complete earthworks for construction of new production and storage hall in logistic park Ostrov u Stříbra.

More information

2016 Tower blocks demolition Chanov

We made complete demolition works of 2 tower blocks including material recycling. The opening Cremony was attended by the Minister for Regional Development Mrs. Karla Šlechtová and by the Mayor of Most Mr. Jan Paparega. 

More information

2016 Assembly of tower crane at Prague, Modřany by our new crane Liebherr LTM 1070

We were able to do assmebly of tower crane at Prague, Modřany with use of crane Liebherr LTM 1070.

More information

2016 New production hall No.10 CTP Bor

Earthworks for new production and storage hall No.10 in logistic park Bor u Tachova.

More information

2016 Footbridge Staňkov

Footbridge relocation by crane AC 500 at Staňkov.

More information

2016 Chlumčany transport and placement of tanks

Transport and following placement of tanks at ceramics factory Chlumčany by cranes AC 200 and AC 50.

More information