References(Page 7)

References(Page 7)

References

2019 Demolition of Strojírny Cheb area

Demolition of buildings in the former premises of Strojírny Cheb, incl. earthworks and construction of monolithic retaining walls. ... More information

2019 Transport of beer tanks

Transport of 10 beer tanks from Bürgstadt, Germany to Pilsen brewery. Beer tank with a diameter of 6.5 m and a length of 23 m, weight 28.7 t. ... More information

2019 Transport of trams

Transport of Škoda 35T trams

More information

2019 Transport of presses

We transported two presses to Hrádek u Rokycan.

More information

2019 Assembly of tower crane

By using mobile crane AC 200 we carried out assembly of tower crane on the pond shore.

More information

2019 Assembly of tower crane

By using mobile crane AC 200 we carried out assembly of tower crane on the pond shore.

More information

2019 Technology installation in the hall in Bor u Tachova

Technology installation in the hall in Bor u Tachova by using two mobile cranes AC 100 and LTM 1070

More information

2019 Transportation and installation of technology

Transportation of technology to the Technical Inspection Station and consequential  installation by using mobile crane AC 50.

More information

2019 New hall at Bor u Tachova

Complete realisation of groundworks for extention  of B6 hall and realisation of paved areas for cars and trucks including utilities in logistic park CTP Bor u Tachova. 

More information

2018 Demolition of block of flats at Bečov

Demolition  of block of flats including material recyclation at Bečov.

More information