References(Page 4)

References(Page 4)

References

2020 Installation of technology

Installation of technology by using mobile crane  AC 500.

More information

2020 Pilsen City Ring, Plaská street

Execution of groundworks for the construction of the Pilsen City Ring.

More information

2020 Transport of tank

We transported a steel tank from Horní Slavkov

More information

2020 Transport of tank

We transported a steel tank from Horní Slavkov

More information

2020 Earthworks for the construction of UniMeC - Phase II. - Pilsen

Earthworks for UniMeC construction -  Phase II. 

More information

2020 Installation of power poles

We installed electric power poles  by using mobile crane  AC 100.

More information

2019 Demolition of reinforced concrete hayloft after

Demolition of reinforced concrete hayloft after a fire in AGRO Staňkov

More information

2019 Demolition of Škoda Ostrov nad Ohří area

Demolition of objects in former Škoda area close to Ostrov nad Ohří.

More information

2019 Transport of tamping machine

We transported tamping machine and by using two AC 100 cranes  installed the machine on the rails.

More information

2019 Christmas tree for Pilsen

In Pilsen part Roudná we loaded a 49-year-old Christmas spruce weighing 5.5 tons using an AC50 crane. ... More information