References(Page 64)
References(Page 64)
References
2003 Customization of Vltava river-basin
We realized a excavation of soil from Vltava river and next customization of its river basin.
2003 Earthworks in Hostivice
We were execute a levelling and earthworks for new hall in industrial zone in Hostivice.
2003 Earthworks on Zipp Chomutov
We realized a levelling and earthworks for Zipp hall in Chomutov.
2003 Transport of Christmas tree Pilsen 2003
Transport of Christmast tree to the Pilsen Main Square was prepared by use of drop deck trailer and was placed by crane APB-Plzeň.
2003 Transport of Christmas tree Prague 2003
Transport of Christmas tree to the Old Town Square Prague. With use of drop deck trailer we implemented transport of Christmas tree with lenght of 20 m from Velké Karlovice.
2003 Transport of steel beam
Steel beam was transported with use of flatbed trailer, cargo had dimentions 35 x 1 x 1,5 m.
2002 Chimney demolition in Plzen
Complete demolition of the chimney were realized in building ZČE in Plzen.
2002 Demolition in Zebrak
We realized the building demolition for construction of new COOP supermarket in Zebrak.
2002 Bridge demolition in Brandysek
Demolition of the bridge in Brandysek include recycling and material disposal.
2002 Demoliton of CKD Lokomotivka
We realized a complete demolition of all CKD Lokomotivka area include area’s redevelopment and include recycling and material disposal.