References(Page 59)

References(Page 59)

References

2004 CTP Divisov

The construction in industrial zone in Divisov required an execution of complete levelling and earthworks in soil no. 5 -7.

More information

2004 Earthworks in Vsechromy

It required a levelling and earthworks for construction in Mountfield area in Vsechromy.

More information

2004 Earthworks and soil stabilization for Grupo

We realize an earthworks and soil stabilization form Grupo hall in Trutnov.

More information

2004 Cooling tower demolition in Skoda area

Complete demoliton of the cooling tower in Skoda area in Plzen.

More information

2004 Grainerys demolition in Chlumcany

Demolition of grainerys in Xella area in Chlumcany.

More information

2004 Transport of air washer

With use of frame trailer, we have been able to transport air washer by dimentions of 10 x 5 x 5 m.

More information

2004 Transport of trolley bus Salzburg

Transport of trolley bus with use of frame trailer on the road Pilsen - Salzburg.

More information

2004 Transport of troley bus to Zlin

With help of drop deck trailer we implemented transport of troley bus on the road Pilsen – Zlín.

More information

2004 Transport of cast Lovosice

Transport of cast was done by help of special trailer on the road Pilsen – Lovosice.

More information

2004 Transport of Christmas tree Boská pole

With use of drop deck trailer we realized transportation of Christmas tree Pilsen – Borská pole.

More information