References(Page 26)
References(Page 26)
References
2014 Flood pool Cholupice
We begun a construction of huge flood pool in Cholupice. This construction include three new roads, cables replacement and tubes laying.
2014 Installation of new bells on the Cathedral of St. Bartholomew in Pilsen
By using a truck – mounted crane AC 200 we installed in Pilsen 5 new bells (Bartholomew, Marie, Jan, Hroznata, Prokop) up to height 50m on the Cathedral of St. Bartholomew.
2014 Hnevnice - flood - protection action
Parts of this construction are flood-protection action and stream revitalization in Hnevnice.
2014 Biogas station Strazovice
Bottoms cleaning from basin for biogas station in Strazovice.
2014 Transport of tunnel shield pieces to Dysina
Transport of tunnel shield pieces to Dysina.
2014 Transport of subway train
We transported skeleton of subway train by frame trailer Goldhofer EURO 64 -04.
2014 Transport and unloading of sewer tank in Pilsen.
Transport and following uloading of two sewer tanks by using mobile crane AC 100 in Pilsen.
2014 Transport of transmitter structure at Pilsen.
Transport of transmitter structure at Sylván in Pilsen.