References(Page 12)

References(Page 12)

References

2018 Installation of technology in Klatovy

Installation of technology by using AC 200 and AC 35 mobile cranes.

More information

2018 Technology dismantling in mine Bílina

 By using mobile cranes AC 200 and AC 160 we dismantled technology in mine Bílina.

More information

2018 2nd phase of D1 motorway modernization

Within the 2nd phase of  D1 motorway modernization and extension  we provide earthworks, soil stabilization, including the laying down of drainages, gutters, sewerage and preparation of the gravel layer.

More information

2018 ZF Electronics Klášterec s.r.o

Earthworks for the construction of a new hall ZF Electronics Klášterec s.r.o. We provide excavation of the pit, transport and deposit of material  in the  total volume of earthworks  about 50,000 m3.

More information

2018 Dismantling of the railway bridge in Nejdek

The AC 500 crane was used to dismantle the railway bridge in Nejdek and to install a temporary bridge.

More information

2018 Transportation of excavators

Transportation of excavators.

More information

2018 Transport of trams 18T type from Plzen Škoda Transportation to Turkey

Transport of trams 18T type from Plzen Škoda Transportation a.s. to Turkey.

More information

2018 Earthworks for new premises of EvoBus in Holýšov

Earthworks for new premises construction of EvoBus in Holýšov, including the topsoil removal, excavation and  deposit of material  in the total volume of earthworks  about 250 000 m3

More information

2018 Dismantling of second part of the railway bridge in Pilsen – main station

By using telescopic crane AC 350 we dismantled second part of the railway bridge in Pilsen – main station. ... More information