Articles in category "" (Page 10)

Articles in category "" (Page 10)
Installation of coastal cannon
Installation of Škoda coastal cannon by a mobile crane Liebherr 1100-4.2, including transport to the destination.
May 15, 2017 12:46 PM MoreDemolition of two bridge overpasses Exit 37 and Exit 41 on the highway D1
Apr 24, 2017 11:10 AM MoreDismantling of railway bridge in Pilsen – main railway station
Today we started with dismantling of railway bridge in Pilsen – main railway station by using AC 500 telescopis crane.
Apr 14, 2017 3:29 PM MoreDismantling of bridge beams on the highway D1 at Rudná u Prahy
With help of AC 500 telescopis crane we dismantled bridge beams on the highway D1 at Rudná u Prahy and afterwards loaded by crane on the trailer and transported to a designated place.
Apr 3, 2017 2:29 PM MoreTransport of a tank from machine-works from Pacov to the Bernard brewery in Humpolec.
Transport of a tank from machine-works from Pacov to the Bernard brewery in Humpolec.
Mar 23, 2017 2:26 PM MoreTransportation of steel tank from Benešov to Dobříč.
Transportation of steel tank from Benešov to Dobříč.
Jan 17, 2017 2:26 PM MoreTower blocks demolition Chanov
We made complete demolition works of 2 tower blocks including material recycling.
Nov 25, 2016 8:41 AM MorePlacement of conveyor at Lovosice
Placement of conveyor weighing 60 tons by cranes AC 500 and AC 350 at Lovosice.
Nov 16, 2016 2:16 PM MoreReconstruction of the National Museum Building
Earthworks in the reconstruction of the historical building of the National Museum in Prague.
Aug 31, 2016 7:27 AM MoreTunneling shield Victoria Pilsen
Tunneling shield Victoria finished the first phase of tunnel excavation in the section Dýšiná - Pilsen.
Jul 18, 2016 10:19 AM More