References in category"References - truck-mounted cranes" (Page 8)

References in category"References - truck-mounted cranes" (Page 8)

References

2015 Installation of steel bridge during reconstruction of railway line Pilsen – Plasy

We did installation of steel bridge with use of crane AC 200 during reconstruction of railway line Pilsen – Plasy.

More information

2015 Installation of railway sections during reconstruction of railway line Pilsen – Plasy.

We performed assembly of railway sections with use of crane AC 200 during reconstruction of railway line Pilsen – Plasy.

More information

2015 Disassembly of steel silos at Domažlice

We implemented disassembly of steel silos at Domažlice by use of crane DEMAG AC 100 and DEMAG AC 35.

More information

2015 Installation of concrete beam at Bezděkov

Transport and following installation of concrete beams was done by crane AC 100 during bridge repair at Bezděkov.

More information

2015 Assembly of tower crane at Prague´s Pankrác

We made an assembly of tower crane by use of crane AC 350 at Prague´s Pankrác.

More information

2015 Assembly of technology at Škoda Pilsen.

Assembly of technology by crane AC 100 and AC 50 at Pilsen areal Škoda.

More information

2015 Advertisement Dobříš

Preparation for film crew. Manipulation with deer by crane AC 40 during filming television advertisement at Dobříš.

More information

2015 Transport and installation of bridge segment at Radejčice

Transport and installation of bridge segment at Radejčice with use of crane AC 350.

More information

2015 Installation for the pedestrian bridge at Cheb

Transport and installation of pedestrian bridge at Cheb.

More information

2015 Railway bridge Dynín

Transport and installation of railway bridge with use of crane AC 200 at Dynín.

More information