References in category"Reference" (Page 57)

References in category"Reference" (Page 57)
References

2005 Trumpf hall in Liberec
It required a complete levelling to build a new Trumpf hall in Liberec.

2005 Bridge no. 056 demoliton on highway D1
Complete demolition of the bridge were executed include material disposal on highway D1.

2005 Makro Liberec
We realized a complete levelling for new Makro building in Liberec.

2005 Foundation of the bridge on highway D3
An earthworks were executed during foundation works on bridges SO 201 and 202 on highway D3.

2005 Redevelopment in former CKD area
Demolition works and earthworks were realized during redevelopment works in former CKD area.

2005 Benatky n. Jizerou - dumping ground construction
Complete construction of a new dumping ground box were realized in Benatky nad Jizerou.

2005 Transport of excavated soil in Zisov
Transport of excavated soil from pond in Zisov.

2005 Trade centre Chodov
We realized a excavating of land coffer for single objels of new trade centre in Chodov.

2004 Demolition of Crown Yard in Praha
Complete demolition of buildings of former brewery on Crown Yard in Praha include underground parts of these buildings and the material disposal.