2013 Disassembly of tunnel shield from subway construction site.
We performed lifting of tunneling shield parts from subway construction site weighing 35t with use of crane AC 500.
2013 Demolition of hall Celestica Lego in Kladno
Now we are realizing of complete demoliton of production hall Celestica in Lego area in Kladno. It is complete demoliton of these building include floor, energoblock, fire tank and utilities.
2013 we transported a mill‘s casing about weight 144 tons to the Lovosice harbor
We transported a mill’s casing about weight 144 tons from Přerov to Lovosice. Oversized cargo of diameter 8,8 m were transported on special leader STZ THP 16 (no. of axis: 16).
2012 Mills casing transportation
We transported a mills casing about dimension 8,48 mand weight 119 tons to the Mělník harbor.
2012 Transportation of the bus to London
Transportation of the bus by designer David Černý to London, venue of 15th Olympics. With using of the frame loader we transported unique double-decker bus from work-room of Prague designer before the Czech House in London.
2012 Demolition of the České typografie (Rudé právo) building and special foundation work for the new Florentinum building in Prague, Florenc
We implemented complete demolition of all buildings and subsequent special foundation work for the construction of the Florentinum administrative centre in the centre of Prague.
2012 Ship transportation
With using of the frame loader we transported a ship of size 27 x 5,45 x 4,2 m.
2012 Placing of the historical tank LTP-38 in the courtyard of the Military history museum
Devolution of the historical tank LTP-38 inthe court of the Military history museum was realized with using of the telescopic crane AC100.
2012 Installing of the press into the hall in Dobřany
With using of our cranes AC100 and AC350 we installed the press into the production hall in Dobřany.