References(Page 30)

References(Page 30)

References

2013 Assemly of steel column in Kárany

We implemented assembly of steel column for bridge in Kárany by telescopic crane AC 350.

More information

2013 Loading of gearbox in Hronov

The loading of gearbox in Hronov was done by telescopic crane AC 80.

More information

2013 Construction of a new hall in Škoda Transportation

By telescopic cranes we assemble new hall in Škoda Transportation a.s.

More information

2013 We made it!! Demolition of three bridges on the highway D1

We carried out the demolition of three bridges on highway D1 in section 21, exit 153 Lhotka and exit 162 Velká Bíteš during works on the modernization of highway D1. Restoration of traffic on the highway D1 was scheduled at 10AM and we were finished in half an hour in advance.

More information

2013 Disassembly of Tunnel shield in Pilsen

Telescopic crane AC 50 was used to disassemble Tunnel shield at the construction site of new Uslavas´sewage collector in Pilsen.

More information

2013 Transit through hub Plzeň

We are executing an earthwork in Prokopova street and earthworks for the new subway in Šumavská street in Pilsen.

More information

2013 Transit through hub Plzeň

We are executing an earthwork in Prokopova street and earthworks for the new subway in Šumavská street in Pilsen.

More information

2013 Recultivation work on trees at the castle in Lány

With help of truck mounted platform Ruthmann T370 we performed recultivation works on trees around the castle in Lány.

More information

2013 Disassembly of galvanizing tub at Čenkov

Disassembly of galvanizing tub weighing 40t at Čenkov was implemented by two telescopic cranes AC 100.