2014 Crane works at Nuclear power plant Dukovany
From Kutná Hora to the Nuclear power plant Dukovany we transported container with backup power total weight 129 tons. Installation of backup power we realized by using two truck-mounted cranes AC 200.
2014 Installation of steel tanks at Česká Lípa.
Montage of steel tanks of diameter 4,9m, lenght 21m and weight of 40 tuns telescopic crane AC 350.
2014 Crane work at nuclear power station Temelín.
Transport of oversize load of total weight 129t from Kutná Hora to nuclear power station Temelín and following installation of new backup source by using two cranes AC 200.
2014 Earthworks for new part U Cenku
We execute an earthworks, cycle track, in-line track include bulwark for sledging and walkway for new park U Cenku about area 170 hectare in Cerny most in Prague.
2014 Assembly of transmitter structure at Pilsen.
Assembly of transmitter structure at Pilsen by telescopic crane AC 100.
2014 Theatre terrace Pilsen
Demolition and earthworks in Pilsen historical centre. It is a landscaping close to J.K.Tyl theatre where was build a new resting area.
2014 Assembly of concrete beams at Veselí nad Lužnicí.
Assembly of concrete beams at Veselí nad Lužnicí by telescopic crane AC 350.
2014 Assembly of steam pipeline at power station Prunéřov.
We ensured at power station Prunéřov assembly of steam pipeline by truss crane CC 2800.
2014 Assembly of section of the bridge at Ústí nad Orlicí
Truss crane CC 2800 and telescopic crane AC 350 realized assembly of bridge section at Ústí nad Orlicí.
2014 Hotel Praha demolition
We execute a extensive demolition of Hotel Praha in Prague. This complex was build in 70’s of past century. We execute a demolition of this building with most modern machinery.