References in category"Reference" (Page 23)

References in category"Reference" (Page 23)

References

2014 Assembly of steam pipeline at power station Prunéřov.

We ensured at power station Prunéřov assembly of steam pipeline by truss crane CC 2800.

More information

2014 Assembly of section of the bridge at Ústí nad Orlicí

Truss crane CC 2800 and telescopic crane AC 350 realized assembly of bridge section at Ústí nad Orlicí.

More information

2014 Hotel Praha demolition

We execute a extensive demolition of Hotel Praha in Prague. This complex was build in 70’s of past century. We execute a demolition of this building with most modern machinery.

More information

2014 Transport of tank from Moravské Bránice

Transport of the tank with lenght of 78 m, diameter 4,25m from Moravské Bránice.

More information

2014 Zevo Chotikov

Demolition works and earthworks for ZEVO Chotikov construction.

More information

2014 Office building Pankrac

Earthworks for new office area Pankrac. We provide excavation of 14m depth a construction pit include its securing and transport of excavated soil.

More information

2014 Disassembly of tower crane at Prague.

Disassembly of tower crane at Prague by telescopic crane AC 160.

More information

2014 Assembly of gas tank at Stod

Assembly of gas tank was conducted by crane AC 50 and crane AC 35.

More information

2014 Aviatica – former Waltrovka area

Earthworks include construction pit and subconcrete for office building Aviatica in former Waltrovka area.

More information

2014 Lifting of the press machine from inside of the hall at Pilsen – Bílá Hora

 We realized lift of the press machine from inside of the hall at Pilsen – Bílá Hora by crane AC 200.

More information