References
2010 Removal of Gothic bell by crane
Removal of Gothic bell. Using a crane, we removed the Maria Hilf Gothic bell dating back to 1419.
2010 Transport of catalysers
Transport of catalysers, Benešov - Stráž pod Ralskem. Using a frame semi-trailer, we transported catalysers from Benešov to Stráž pod Ralskem. Length of oversized cargo 11 m, diameter 5.4 m
2009 Placement of press machine at Rokycany
Telescopic crane AC 35 was used to place bed to press machina.
2009 Disassembly of railway bridge at Benešov
With help of telescopic crane AC 350 we disassembler railway bridge.
2009 Assembly of heating plant Chomutov
Lifting of the technology at Chomutov heating plant we performed with help of truss crane CC 2000.
2009 Air conditioning unit installation
Assembly of air conditioning unit was performed with using of the telescopic crane with capacity to 500 tons.
2009 Assembly of technologies in Kralupy nad Vltavou
Using telescopic cranes, we assembled technologies in Kralupy nad Vltavou.
2009 Assembly of technologies in Klatovy
Using a truss crane of up to 600t and a telescopic crane of up to 160t, we assembled technologies in Klatovy.
2008 Demolition of bridge Poděbrady
Truss crane CC 2000 and CC 2800 we performed demolition of bridge at Poděbrady.