References in category"References - truck-mounted cranes" (Page 4)

References in category"References - truck-mounted cranes" (Page 4)

References

2018 Installation of beer tanks in Budweiser Budvar

With the AC 350 mobile crane we installed 34 pieces of beer tanks in Budweiser Budvar. ... More information

2018 Technology dismantling in mine Bílina

 By using mobile cranes AC 200 and AC 160 we dismantled technology in mine Bílina.

More information

2018 Installation of technology in Klatovy

Installation of technology by using AC 200 and AC 35 mobile cranes.

More information

2018 Turbine transportation and unloading

Turbine  unloading by using mobile crane AC 500.

More information

2018 Dismantling of railway foot over bridge in Cheb

By using mobile crane AC500 we carried out dismantling of railway foot over bridge in Cheb.

More information

2018 VTE gearbox replacement

By using mobile crane AC 500 we carried out VTE gearbox replacement. ... More information

2018 Dismantling of the railway bridge in Nejdek

The AC 500 crane was used to dismantle the railway bridge in Nejdek and to install a temporary bridge.

More information

2018 Dismantling of second part of the railway bridge in Pilsen – main station

By using telescopic crane AC 350 we dismantled second part of the railway bridge in Pilsen – main station. ... More information

2018 Installation of tank at Horažďovice

Installation of tank by using mobile crane AC 100. ... More information

2017 Installation of 10 beer tanks in Pilsner Urquell Brewery

Installation of 10 beer tanks in Pilsner Urquell Brewery in diameter 6,5m and weight 23,5t by using AC 500 and AC 200 cranes. ... More information