References in category"References - truck-mounted cranes" (Page 4)
References in category"References - truck-mounted cranes" (Page 4)
References
2018 Installation of beer tanks in Budweiser Budvar
With the AC 350 mobile crane we installed 34 pieces of beer tanks in Budweiser Budvar. ... More information
2018 Technology dismantling in mine Bílina
By using mobile cranes AC 200 and AC 160 we dismantled technology in mine Bílina.
2018 Installation of technology in Klatovy
Installation of technology by using AC 200 and AC 35 mobile cranes.
2018 Turbine transportation and unloading
Turbine unloading by using mobile crane AC 500.
2018 Dismantling of railway foot over bridge in Cheb
By using mobile crane AC500 we carried out dismantling of railway foot over bridge in Cheb.
2018 VTE gearbox replacement
By using mobile crane AC 500 we carried out VTE gearbox replacement. ... More information
2018 Dismantling of the railway bridge in Nejdek
The AC 500 crane was used to dismantle the railway bridge in Nejdek and to install a temporary bridge.
2018 Dismantling of second part of the railway bridge in Pilsen – main station
By using telescopic crane AC 350 we dismantled second part of the railway bridge in Pilsen – main station. ... More information
2018 Installation of tank at Horažďovice
Installation of tank by using mobile crane AC 100. ... More information
2017 Installation of 10 beer tanks in Pilsner Urquell Brewery
Installation of 10 beer tanks in Pilsner Urquell Brewery in diameter 6,5m and weight 23,5t by using AC 500 and AC 200 cranes. ... More information