References in category"References - truck-mounted cranes" (Page 10)

References in category"References - truck-mounted cranes" (Page 10)

References

2014 Installation of new bells on the Cathedral of St. Bartholomew in Pilsen

By using a truck – mounted crane AC 200 we installed in Pilsen 5 new bells (Bartholomew, Marie, Jan, Hroznata, Prokop) up to height  50m on the Cathedral of St. Bartholomew. 

More information

2014 Crane works at Nuclear power plant Dukovany

From Kutná Hora to the Nuclear power plant Dukovany we transported container with backup power total weight 129 tons.  Installation of backup power we realized by using two truck-mounted cranes AC 200.

More information

2014 Installation of steel tanks at Česká Lípa.

Montage of steel tanks of diameter 4,9m, lenght 21m and weight of 40 tuns telescopic crane AC 350.

More information

2014 Crane work at nuclear power station Temelín.

 Transport of oversize load of total weight 129t from Kutná Hora to nuclear power station Temelín and following installation of new backup source by using two cranes AC 200.

More information

2014 Assembly of transmitter structure at Pilsen.

Assembly of transmitter structure at Pilsen by telescopic crane AC 100.

More information

2014 Assembly of concrete beams at Veselí nad Lužnicí.

Assembly of concrete beams at Veselí nad Lužnicí by telescopic crane AC 350.

More information

2014 Assembly of steam pipeline at power station Prunéřov.

We ensured at power station Prunéřov assembly of steam pipeline by truss crane CC 2800.

More information

2014 Assembly of section of the bridge at Ústí nad Orlicí

Truss crane CC 2800 and telescopic crane AC 350 realized assembly of bridge section at Ústí nad Orlicí.

More information

2014 Disassembly of tower crane at Prague.

Disassembly of tower crane at Prague by telescopic crane AC 160.

More information

2014 Assembly of gas tank at Stod

Assembly of gas tank was conducted by crane AC 50 and crane AC 35.

More information